A school-based professional development (PD) program is an in-service training (INSET) or a learning action cell (LAC) that a school plans, designs, delivers and evaluates itself. The National Educators Academy of the Philippines (NEAP) sets out how in its Guidelines on the School-Level Development and Implementation of School-Based Professional Development (PD) Programs, Enclosure No. 1 to Memorandum DM-OUHROD-2024-1576 of August 16, 2024. The school head, with the assistant principal, master teachers and head teachers, finds what teachers need from the school’s own records, ranks those needs, and builds a program around the top ones. The finished proposal reaches the schools division office (SDO) 45 working days before the program: 15 working days for quality assurance, then 30 for accreditation by the Professional Regulation Commission (PRC). Only a program that passes is run as an official DepEd program.

The memorandum was written for fiscal year 2024 and for the three-day INSET of November 2024, and its school-level guidelines still govern. NEAP’s memorandum on the fiscal year 2026 fund for in-service training makes them the “basis for the school-based implementation and quality assurance of PD programs, unless otherwise superseded by subsequent guidelines”, and reprints them unchanged as its Enclosure 4 (Memorandum DM-OULS-2026-179, May 11, 2026, Sec. IV.f). As of November 23, 2026, no DepEd order or national memorandum has replaced them. Two parts were written for the old calendar: a “3-day” INSET design and a learning action plan carried out “within the next two quarters”. Under the three-term calendar of DepEd Order No. 009, s. 2026, schools hold two INSET days in each End-of-Term Block, “in accordance with the standards set by the National Educators Academy of the Philippines (NEAP)” (para. 21).

The rules below are those in force on November 23, 2026.

Key findings

  • The school head leads the whole cycle. With the assistant principal, head teachers and master teachers, the school head plans and designs the programs, reviews each proposal and endorses it to the SDO, manages its delivery, monitors teachers’ action plans and submits the completion report (Encl. 1, II.D.1 to 6).
  • Needs come from records the school already keeps, seven of them named, from teachers’ self-assessments and classroom observations to the Performance Monitoring and Coaching Form. Each need is rated 1 to 3 on seriousness, urgency and growth, then ranked (Encl. 1, I.A.1 and 2; Encl. 3).
  • A proposal is a packet of seven documents: the program design or five-month LAC plan, the monitoring and evaluation (M&E) plan, assessment tools, the learning action plan, a budget matrix, the resource persons’ curricula vitae and an end-of-day evaluation tool (Encl. 1, I.D.1.a).
  • It must reach the SDO 45 working days ahead. For the December 17 and 18, 2026 INSET, that day was Monday, October 12, 2026. For the April 2 and 5, 2027 INSET, the safe day is Tuesday, January 26, 2027: Wednesday, January 27 on the holidays proclaimed so far, one day earlier once Eid’l Fitr, expected about March 10, 2027, is proclaimed (Encl. 1, I.D.1.b; DO 009, s. 2026, Annex B).
  • Only a quality-assured program may run as an official DepEd program, and it is delivered as approved (Encl. 1, I.D.1.c, I.F.1 and 2).
  • Every program is evaluated at Kirkpatrick’s four levels: a daily reaction form, the program’s assessments (a pre-test and a post-test for an INSET), each teacher’s Learning Action Plan, and an impact assessment (Encl. 1, I.D.1.a and I.G.2). The plan’s template is titled the Workplace Application Plan (WAP) (Encl. 12).
  • The completion report goes to the SDO 10 working days after the program (Encl. 1, I.G.3.a).

What a school-based PD program is

DepEd’s memorandum covers four kinds of program: those developed by regional offices, those developed by SDOs, the three-day school-based INSET of November 25 to 29, 2024, and the LAC (DM-OUHROD-2024-1576, item 3). Programs developed by regions and divisions follow DepEd Memorandum No. 044, s. 2023, NEAP’s interim guidelines on quality assurance and M&E. The two programs a school develops, its INSET and its LACs, follow Enclosure 1 (items 5 and 6).

An INSET is a training held over days when teachers are not teaching. A LAC is a group of teachers who meet regularly during the school year to solve problems of teaching together, under DepEd Order No. 35, s. 2016. The guidelines treat both as programs with a design, a quality check and an evaluation: an INSET is planned as a three-day design and a LAC as a five-month plan (Encl. 1, I.D.1.a).

Which NEAP program a school may run

The memorandum matches each level of the Department to the NEAP Core Programs it may develop (item 4):

Level Induction Regular Program Subject-Content Program Master Class Special Program
Regional office ✓ ✓ ✓ ✓
Schools division office ✓ ✓ ✓ ✓ ✓
School INSET ✓ ✓ ✓ ✓ ✓
School LAC ✓ ✓ ✓

The Regular, Subject-Content and Master Class programs are NEAP’s Career Progression programs. A school’s INSET may be any of the five; a LAC may be only one of the three Career Progression programs.

Who does it in the school

The guidelines name the school head and, beside the school head, the assistant principal, the head teachers and the master teachers (Encl. 1, II.D). Master teachers already carry the role: the 2024 order on teachers’ workload includes “Learning Action Cell (LAC) coordinator/In-Service Training (INSET) Coordinator” among their functions (DepEd Order No. 005, s. 2024, Sec. V.A.3, item 3). A school without an assistant principal or a master teacher works with the head teachers or the senior teachers it has; the guidelines do not say who stands in.

The school-based PD program cycle

Figure 1 of the guidelines draws the cycle as twelve boxes. Eight run in a row: Professional Development Priorities, Needs Assessment, Planning, Designing, Learning Resource Development, Delivery, Workplace Application and Outcome/Impact, with a line from the last back to the first. Needs Assessment and Learning Resource Development both feed Quality Assurance, which leads to PRC Accreditation and a Repository; Delivery and Outcome/Impact both feed Monitoring & Evaluation.

Enclosure No. 1 to DM-OUHROD-2024-1576, Figure 1, redrawn

The school-based PD program cycle

DepEd’s drawing has twelve boxes. The eight in a row are the main line, from the priorities to the outcome, and a line runs from the last back to the first. Under them are quality assurance and monitoring. Choose a box to read what the guidelines ask at that step.

1 of 12Where the cycle starts and returns

Professional Development Priorities

The drawing starts here and brings the line from Outcome/Impact back here, so one program’s results shape the next.

Where needs come from

The design checklist asks whether a proposal “is based on the results of competency-based professional development needs assessments (i.e., through individual development plans (IDPs), DepEd priorities across levels, learners’ learning outcomes, etc.)”.

Encl. 9, Strength of Research Base

INSET topics in SY 2024-2025

“Topics for School-Based INSET shall be aligned with any of the following priority programs”: eleven, from the MATATAG Curriculum to subject content-based programs.

DM-OUHROD-2024-1576, item 7

The line back

A program’s completion report and its results “shall be the basis for the enhancement of the developed and delivered PD Program.”

Encl. 1, I.G.3.c

2 of 12The main line

Needs Assessment

The school’s instructional leaders find what teachers need from records the school already keeps.

Who

“The School Head together with the Assistant Principal, Master Teacher, Head Teacher shall identify the needs of the teachers (target group)”.

Encl. 1, I.A.1

From what data

Data “drawn from, but not limited to, the following”:

  • Self-assessment Tool
  • Classroom Observation Tool
  • Individual development Plan
  • Results of Classroom based assessment (learner’s performance)
  • Instructional supervisory plan
  • School’s Technical Assistance Plan, performance, and agreement
  • Performance Monitoring and Coaching Form

Encl. 1, I.A.1.a to g

Prioritizing

“Consider how significant the performance and competency gaps are in the identified needs, how urgent the needs must be addressed, and the growth potential/outcomes that may result if the needs are addressed.” Enclosure 3 rates each need 1 to 3 on seriousness, urgency and growth, adds the ratings, and ranks the needs.

Encl. 1, I.A.2; Encl. 3

Mapping

“Map the identified priority PD needs to PPST Domains, Strands, and Indicators.”

Encl. 1, I.A.3

3 of 12The main line

Planning

The team turns the top needs into a program with a team, a schedule and a budget.

The seven steps

Planning has seven steps:

  • Determine the topic/s to be covered.
  • Clarify the workplace development objectives.
  • Determine appropriate PD program to address the set objectives.
  • Schedule activities: program designing, LRM development, delivery, monitoring and evaluation.
  • Identify the Program Management Team and their Terms of Reference.
  • Identify the facilities, equipment, materials, and other logistics needed to implement the PD program.
  • Estimate budget requirements and identify the fund source.

Encl. 1, I.B.1 to 7

Which program a school may run

A school’s INSET may be any of the NEAP Core Programs (Induction, the three Career Progression programs and the Special Program); a LAC, only the three Career Progression programs: Regular, Subject-Content and Master Class.

DM-OUHROD-2024-1576, item 4

4 of 12The main line

Designing

Each session gets its objectives, content, activities, assessment, output, time and speaker.

The design steps

Design and development sets, for each session:

  • Set session objectives.
  • Select and organize content.
  • Determine a variety of activities (methodology).
  • Identify all learning resource materials to support the delivery of session/s.
  • Determine assessment strategies and tools.
  • Determine session outputs.
  • Estimate time requirement.
  • Ensure that the PD program design promotes Gender Equality, Disability, and Social Inclusion.
  • Assign resource person/s.

Encl. 1, I.C.1 to 9

Objectives in four layers

The INSET plan form asks for a results objective, an application objective (“Back in the classroom, the participants will be able to:”), a terminal objective and enabling objectives; the LAC plan form, the first three.

Encl. 4 and 5, Program Description

5 of 12The main line

Learning Resource Development

The slides, handouts and worksheets are made, and checked against Enclosure 2’s standards.

The rule

“Develop learning resource materials (e.g., slide decks, handouts, worksheets) compliant with the set quality standards (see Enclosure 2).”

Encl. 1, I.C.10

Some of the standards

Enclosure 2 sets general standards and standards for printed materials and slide decks, among them:

  • Content of LRM is accurate and authority-based.
  • LRM is copyright compliant.
  • LRM adheres to GEDSI principles.
  • observe 7x7 rule: maximum of 7 lines per slide, maximum of 7 words per line
  • Body text uses 11-13 points; type size for headings two points larger than the body text.

Encl. 2

Before making new ones

“Available quality-assured learning resource materials from the Learning Resource Portal are tapped for possible adoption or customization, if applicable.”

Encl. 2

6 of 12Quality assurance

Quality Assurance

The school sends the whole proposal to the division, which checks it against the design standards.

The packet

An INSET proposal holds a 3-day PD program design, an M&E plan, pre and post assessment tools, a learning action plan, a budget matrix, the curriculum vitae of resource person/s and an end-of-day evaluation tool. A LAC proposal holds the same, with a 5-month LAC plan and assessment tools in place of the first and third.

Encl. 1, I.D.1.a

The deadline

Proposals go “to SDO-SGOD-HRDS for quality assurance and PRC accreditation 45 working days before the implementation.” The SDO quality-assures them “within the first 15 working days”, and PRC accreditation takes “the remaining 30 working days.”

Encl. 1, I.D.1.b

What passing means

“Only school-based PD program proposals compliant with the set quality standards shall be issued a Certificate of Quality Assurance, be processed for PRC accreditation, and be implemented as an official DepEd professional development program.”

Encl. 1, I.D.1.c

The school head’s part

“School head shall review proposed school-based PD programs based on the standards and requirements set by these guidelines and endorsed to SDO for quality assurance and PRC accreditation.” The checklist is Enclosure 9: 32 standards under 14 components.

Encl. 1, II.D.2; Encl. 9

7 of 12Quality assurance

PRC Accreditation

The division submits the quality-assured program to the Professional Regulation Commission.

Every program

“All professional development programs quality assured by NEAP Central Office, Regional Offices, and Schools Division Offices shall be submitted to the Professional Regulation Commission for accreditation.”

Encl. 1, I.D.2.a

Who files a school’s program

The SGOD-HRDS “shall take charge of the program accreditation of PD programs developed at the SDO and school levels.”

Encl. 1, I.D.2.c

8 of 12Quality assurance

Repository

Accredited programs are deposited where other schools can adapt them; the dashed line runs to Delivery.

Where

Quality-assured and PRC-accredited programs are deposited in a “SDO-managed repository for school-developed PD programs”, and the school head “shall manage the repository of quality-assured and PRC-accredited school-based PD programs.”

Encl. 1, I.E.1.c; II.D.6

Adapting one

Designs in a repository “may be made available for adaption and reference”, but a proposal adapting them “shall undergo the complete PD program development cycle.”

Encl. 1, I.E.2 and 3

For SY 2024-2025

“School-Based INSET for SY 2024-2025 may be designed based on existing Central Office-, RO-, and SDO-developed programs that are quality-assured by NEAP.”

DM-OUHROD-2024-1576, item 8

9 of 12The main line

Delivery

The program runs as the quality-assured design says, under a program management team.

Only a quality-assured program

“Only quality assured PD programs shall be delivered through various delivery modality such as, but not limited to, face-to-face, online, blended, and self-paced.” Programs are delivered “consistent with the quality assured and PRC-accredited proposal.”

Encl. 1, I.F.1 and 2

Two jobs

Program Management runs the program to the delivery standards; Learning Management delivers the target competencies “according to adult-learning principles”.

Encl. 1, I.F.4; Encl. 10

From the delivery standards

Enclosure 10 lists, among others:

  • Adequate session breaks (15-30 minutes mid-morning and mid-afternoon for snacks and stretching, and one hour for lunch) are provided in a timely manner.
  • To the extent possible, “working breaks” are to be avoided, unless limited session time necessitates these.
  • Zero-tolerance on the commission of sexual harassment, bullying, and intimidation is observed; incidents are handled by PMT within 24 hours from receipt of the report or information.
  • Daily attendance checks are done by the PMT.

Encl. 10

10 of 12The main line

Workplace Application

Each teacher leaves with a plan for using what was learned, and the immediate supervisor follows it up.

The plan

“The Learning Action Plan (LAP) shall be the final output in all school-based PD programs to measure whether participants were truly impacted by the learning and if they’re applying what they have learned.” Its template, Enclosure 12, is titled the Workplace Application Plan (WAP).

Encl. 1, I.G.2.c; Encl. 12

When

INSET: prepared in the “Last session of 3rd day”, carried out “Within the next two quarters”. LAC: prepared “Every after LAC session”, carried out “Up to maximum of 2 months after the completion of the 5-month LAC”.

Encl. 1, I.G.2.c, table

Who follows it up

“The immediate supervisor of the teacher participant shall monitor and ensure that the LAP is implemented within the prescribed timeline and provide technical assistance if necessary.”

Encl. 1, I.G.2.c

11 of 12The main line

Outcome/Impact

After the program, once teachers begin to apply their plans, the division assesses what changed.

Level 4, Results

“After the PD Program has been completed and begin to apply what they have learned through their LAP, an impact assessment shall be conducted per governance level.”

Encl. 1, I.G.2.d

Who assesses a school’s program

“SGOD-HRDS and SMME shall conduct an impact assessment of the school-developed PD programs.”

Encl. 1, II.C.6

12 of 12Monitoring and evaluation

Monitoring & Evaluation

Delivery is monitored against the design, and the program is evaluated at Kirkpatrick’s four levels.

Monitoring

Delivery “shall be monitored by the RO/SDO/School Heads” against the quality-assured proposal and the indicators of the PD Compliance Monitoring Tool (Enclosure 11).

Encl. 1, I.G.1.a

Evaluation

“The Kirkpatrick’s Levels of Evaluation shall be utilized in all School-based PD program”:

  • Level 1, Reaction: the End-of-Day Evaluation (Enclosure 7), reported at the daily debriefing
  • Level 2, Learning: the assessments in the proposal
  • Level 3, Behavior: the Learning Action Plan
  • Level 4, Results: an impact assessment

Encl. 1, I.G.2

The completion report

“The School Head together with the Program Management Team shall prepare and submit the accomplished Program Completion Report to the Schools Division Office 10 working days after the conduct of the program.”

Encl. 1, I.G.3.a

Source: Memorandum DM-OUHROD-2024-1576, August 16, 2024, Enclosure No. 1 (“Guidelines on the School-Level Development and Implementation of School-Based Professional Development (PD) Programs”), Figure 1 and Sections I and II, with Enclosures 2 to 5, 7 and 9 to 12.

DepEd’s Figure 1 redrawn. Its twelve boxes, their words and their lines follow DepEd’s drawing, which colors the priorities gray, the main line yellow, quality assurance blue and monitoring green; the dashed line from Repository meets the arrow into Delivery, as DepEd draws it. Each box’s one-line summary is this guide’s own; the facts under it quote the guidelines, which DM-OULS-2026-179 of May 11, 2026 reprinted unchanged as its Enclosure 4.

The guidelines’ sections follow the same order, A to G: needs assessment, planning, design and development, quality assurance and PRC accreditation, the repository, delivery, and M&E. The line from Outcome/Impact back to the priorities is the completion report at work: its results “shall be the basis for the enhancement of the developed and delivered PD Program” (Encl. 1, I.G.3.c).

Needs assessment: finding and ranking what teachers need

The school head, “together with the Assistant Principal, Master Teacher, Head Teacher”, identifies teachers’ needs from data “drawn from, but not limited to” seven sources (Encl. 1, I.A.1):

Source What it can show about a teacher’s needs
Self-assessment Tool What teachers say they find hard
Classroom Observation Tool What observers saw in lessons
Individual development Plan The goals each teacher set
Results of Classroom based assessment (learner’s performance) Where learners are behind
Instructional supervisory plan What the school’s supervision is following up
School’s Technical Assistance Plan, performance, and agreement What the division agreed to help the school with
Performance Monitoring and Coaching Form What coaching sessions recorded

No single source is enough. A World Bank survey of Philippine schools in late 2014 found that teachers rated their own subject knowledge highly despite low scores on subject tests, and concluded that “self-assessments of teachers’ strengths and weaknesses may not be a good basis on which to plan professional development activities” (World Bank, 2016, p. 6). A need that shows in the self-assessment and also in observations or in learners’ results is the one to rank high. EDCOM II’s final report names the failure this step guards against: “Despite the presence of formal Training Needs Assessments (TNAs), there is substantial misalignment between training content and teachers’ identified needs” (EDCOM II, 2026, p. 288).

Ranking the needs: seriousness, urgency and growth

The guidelines ask the team to “Consider how significant the performance and competency gaps are in the identified needs, how urgent the needs must be addressed, and the growth potential/outcomes that may result if the needs are addressed” (Encl. 1, I.A.2). Enclosure 3 turns this into a matrix. Each need is rated 1 to 3 on three criteria, the ratings are added, and the needs are ranked. The three criteria are those of Charles Kepner and Benjamin Tregoe’s situation appraisal, a management method first published in 1965, which asks of each concern how serious its current impact is, how urgent it is to act, and “What evidence is there that the seriousness will grow?” (Kepner and Tregoe, The New Rational Manager, pp. 173 to 174). Kepner and Tregoe compare concerns against one another and give no scale. The 1 to 3 ratings and the sum are the matrix’s own.

Enclosure No. 3 to DM-OUHROD-2024-1576

Rank your school’s PD needs

Rate each need from 1 to 3 on the three criteria of DepEd’s matrix. The ratings are added and the needs ranked, highest total first. The five needs below belong to an invented school: type over them, or clear them and enter your own. Nothing you type is kept or sent anywhere.

Seriousness
the direct impact of the learning need to the organization’s strategic direction.3 Very Serious · 2 Serious · 1 Less Serious
Urgency
answers the question of how immediate must the learning need be addressed in reference to the organizational priorities.3 Very Urgent · 2 Urgent · 1 Less Urgent
Growth
refers to the extent to which the learning need if left unaddressed will give rise to more problems.3 Great Extent · 2 Moderate extent · 1 Low Extent
  1. Need 1
    Seriousness
    Urgency
    Growth

    Total 9 of 9 · Rank 1

  2. Need 2
    Seriousness
    Urgency
    Growth

    Total 8 of 9 · Rank 2

  3. Need 3
    Seriousness
    Urgency
    Growth

    Total 6 of 9 · Rank 3

  4. Need 4
    Seriousness
    Urgency
    Growth

    Total 6 of 9 · Rank 3

  5. Need 5
    Seriousness
    Urgency
    Growth

    Total 4 of 9 · Rank 5

The needs in order

  1. 1Teaching reading to Grade 4 to 6 learners who read below grade levelTotal 9 · PPST 1.4 Strategies for promoting literacy and numeracy
  2. 2Asking questions that make learners explain their reasoningTotal 8 · PPST 1.5 Strategies for developing critical and creative thinking, as well as other higher-order thinking skills
  3. 3Writing summative tests that match the learning competenciesTotal 6 · PPST 5.1 Design, selection, organization and utilization of assessment strategies
  4. 3Adjusting lessons for learners with disabilitiesTotal 6 · PPST 3.3 Learners with disabilities, giftedness and talents
  5. 5Using a projector and slides in classTotal 4 · PPST 1.3 Positive use of ICT

Source: DM-OUHROD-2024-1576, Enclosure No. 3 (“Sample PD Needs Prioritization Matrix”), and Enclosure No. 1, I.A.1 to 3. This form is to be accomplished by the School Head together with the Assistant Principal, Master Teacher, Head Teacher from the result of Needs Assessment Tools.

The school, its five needs, where each showed, its strand and its ratings are invented. The criteria, their meanings and the rating scale are Enclosure No. 3’s; its table heads the first column “Significance (1-3)”, echoing Enclosure No. 1’s “how significant” (I.A.2). Giving tied totals one rank is the figure’s own: two needs with the same total can differ, and the team decides between them.

A total hides how a need got there. In the sample, adjusting lessons for learners with disabilities and writing summative tests both total 6, but the first is rated low on urgency and high on growth: left alone, it gets worse. The matrix ranks; the team still decides.

Mapping the needs to the PPST

The last step of the needs assessment is to “Map the identified priority PD needs to PPST Domains, Strands, and Indicators” (Encl. 1, I.A.3). The INSET and LAC plan forms carry the mapping into the design, in a row for the professional standard, its domains, strands and indicators (Encl. 4 and 5). The guide to the Philippine Professional Standards for Teachers lists all 37 strands. A need that fits no indicator can still be met: the design checklist accepts a program that responds to a standard’s indicator “and/or other emerging needs of the Department” (Encl. 9).

Planning the program

Planning turns the top needs into a program. Its seven steps are to determine the topics, clarify the “workplace development objectives”, choose the program type, schedule the designing, materials, delivery and M&E, name the Program Management Team and its terms of reference, list the facilities and logistics, and “Estimate budget requirements and identify the fund source” (Encl. 1, I.B.1 to 7).

Topics: the priorities for 2026

For School Year 2024-2025, the memorandum required INSET topics to align with one of eleven priority programs, from the MATATAG Curriculum and the National Learning Camp to Gender and Development and subject content-based programs (item 7). The fiscal year 2026 memorandum lists the priorities NEAP funds now. Its INSET funds go to programs on the Revised K to 12 Curriculum, the Strengthened Senior High School Curriculum, induction, school leaders’ and teaching-related personnel’s development, literacy and numeracy across key stages, AI and education technology, and “Other relevant school-based professional development initiatives aligned with DepEd priorities” (DM-OULS-2026-179, Sec. IV.c). It adds that “all newly-hired teachers must undertake the Induction/Onboarding Program by December 2026”.

Two 2026 orders add fixed content. “Schools shall conduct at least one session during the annual In-Service Training for Teachers (INSET) related to learning continuity”, such as trauma-informed teaching and psychological first aid (DepEd Order No. 014, s. 2026, para. 35). And schools “Capacitate personnel through LAC and INSET sessions” under the guidelines on a safe and motivating learning environment (DepEd Order No. 006, s. 2026, Sec. IX.D.4).

Those lists set the field. The school’s own needs, ranked in the matrix above, decide what its INSET covers within it.

What goes into the school-based INSET plan

The INSET plan (Enclosure 4) is the program design a school submits. It has six parts:

Part What it asks
Proponent profile The school, its ID, address, telephone and email, and a focal person
INSET profile Title; rationale “supported by data on teachers’ professional development needs, relevant research, and legal basis (if any)”; program description with its objectives; the professional standard, domains, strands and indicators; target participants with their number, sex and age; delivery platform and dates
INSET content details For each session: duration, session objectives, topic, methodology, assessment strategies and tools, outputs, and the resource speaker
Budget estimate plan The funding source and how the money is allocated
M&E plan One row for each of Kirkpatrick’s four levels (results, behavior, learning, reaction), with columns for objectives, methods and tools, data sources, schedule, persons responsible, support needed and users of the data
Declaration Signed by the proponents; agrees to NEAP being “co-owner of all the data gathered and the copyright of any publication of the use of these data”

The program description states objectives in layers. A results objective says what improves “As a result of the participants’ improved competence and performance”. An application objective begins “Back in the classroom, the participants will be able to”. A terminal objective covers the end of the training, and enabling objectives give “the key knowledge, skills, and attitude participants are expected to gain” (Encl. 4). The design checklist wants these objectives written to “the SMART principles” (Encl. 9).

The design steps behind the plan are to set session objectives, select content, choose varied activities, list the materials, set assessments and outputs, estimate the time, make sure the design “promotes Gender Equality, Disability, and Social Inclusion”, and assign resource persons (Encl. 1, I.C.1 to 9).

A three-day design for a two-day INSET

The plan form says “By the end of the 3-day training”, and the packet asks for a “3-day PD program design” (Encl. 4; Encl. 1, I.D.1.a). Both were written for the November 2024 INSET. DO 009, s. 2026 gives each term’s INSET two days: “These days shall be allocated for the conduct of a 16-hour INSET per term, contributing to the completion of the minimum 32-hour professional development provision per school year” (Annex A, Days 7-8). The 2026 reprint of the guidelines kept the three-day wording, and no issuance converts it. A design for the two INSET days of a term, 16 hours in all, meets the calendar. A school whose SDO still asks for three days should ask the SGOD-HRDS which design it will review.

The five-month LAC plan

A LAC proposal uses Enclosure 5, the Five-Month Learning Action Cell (LAC) Plan. It has the same parts as the INSET plan, with the department or learning area in place of the school’s address and a row for each of five LAC sessions with its date and duration. Its sample row puts “LAC 1” on “August 19, 2024 / 120 minutes”, and its period of implementation is “August - December 2024” (Encl. 5). Its objectives stop at the terminal objective, “By the end of the 5-month LAC sessions”. Under the three-term calendar, LAC sessions are held “within the Instructional Block”, and DepEd has said that guidelines on their scheduling will follow (DO 009, s. 2026, para. 22); as of November 23, 2026, none has been issued. A five-month plan therefore skips the End-of-Term Blocks it crosses. How a LAC is run, from its norms to its records, is in the guide to learning action cells and in LAC session problems and solutions.

Learning materials and resource persons

Materials follow Enclosure 2’s quality standards. Content must be “accurate and authority-based” and the materials “copyright compliant”, with permission “from the Original Creator and Copyright Owner” or free stock and Creative Commons images (Encl. 2). Printed materials use body text of 11 to 13 points. Slides follow the “7x7 rule: maximum of 7 lines per slide, maximum of 7 words per line” and use no more than three font styles. Before making new materials, the team looks in the Learning Resource Portal: “Available quality-assured learning resource materials from the Learning Resource Portal are tapped for possible adoption or customization, if applicable” (Encl. 2).

Each resource person submits the NEAP curriculum vitae form (Enclosure 6), with their track record of the last five years, education, five most recent jobs, licenses and a scanned PRC license. Its note asks that NEAP “be informed of any change/s on resource person/s at least 10 days before” the program, and lets a substitute “submit this duly accomplished form three (3) days before the start” (Encl. 6). The design checklist asks that the CVs “reflect expertise relevant to the PPST/PPSSH/PPSS domain/s, strand/s and indicator/s covered” in each speaker’s session (Encl. 9).

The proposal packet and quality assurance

All school-based proposals are quality-assured, and each holds seven documents (Encl. 1, I.D.1.a):

INSET LAC Form
3-day PD program design 5-month LAC plan Enclosure 4 or 5
M&E plan M&E plan Part of Enclosure 4 or 5
Pre and post assessment tools Assessment tools The school’s own
Learning action plan Learning action plan Enclosure 12
Budget matrix Budget matrix Enclosure 8
Curriculum vitae of resource person/s Curriculum vitae of resource person/s Enclosure 6
End-of-day evaluation tool End-of-day evaluation tool Enclosure 7 is a sample

The school head reviews the proposal first: “School head shall review proposed school-based PD programs based on the standards and requirements set by these guidelines and endorsed to SDO for quality assurance and PRC accreditation” (Encl. 1, II.D.2). The SDO’s School Governance and Operations Division, through its Human Resource Development Section (SGOD-HRDS), quality-assures it with the Curriculum Implementation Division (II.C.2).

The design checklist

Enclosure 9, the School-Based PD Program Design Quality Standards Checklist, is the reviewers’ form: 32 standards under 14 components, each marked met with a check or not met with a cross and a suggestion. A school head who reviews a proposal against it before endorsing it catches what the SDO would send back.

Component What a reviewer looks for (selected standards)
Strength of research base Based on competency-based needs assessments; content justified by research, theory or DepEd issuances
Alignment to the professional standards At least one PPST, PPSSH or PPSS domain, strand and indicator, named for each session
Target participants profile Career stage, position, subject or grade, and the number of participants
Articulation of learning objectives SMART objectives that build the target standard
Session contents Adequate, accurate, aligned with curriculum standards for subject content, well sequenced
Soundness of methodology Adult learning principles; a step-by-step account of how the speaker will deliver content; the materials named
Assessment strategies and tools Varied formative and summative assessment; rubrics for performance tasks
Expected outputs Concrete outputs, “e.g., reflection journal, TA Plan, lesson exemplar, rubrics, worksheets”
Workplace application A WAP that “can be realistically completed within an adequate period (exclusive of school breaks for teachers)”
Time requirement Dates that “do not interfere with” teaching; sessions well timed
Credentials of resource speakers CVs that match the indicators of each session
Gender equality, disability and social inclusion Selection, activities, materials and speakers that engage participants of every background
Monitoring and evaluation All four Kirkpatrick levels, with the Level 1 tool, the Level 2 tools and the Level 3 WAP template submitted
Budget and costing Cost per participant “within the allowable limits according to government budgeting, accounting, and auditing rules and regulations”

A proposal that passes receives a Certificate of Quality Assurance and goes on to PRC accreditation. “Only school-based PD program proposals compliant with the set quality standards shall be issued a Certificate of Quality Assurance, be processed for PRC accreditation, and be implemented as an official DepEd professional development program” (Encl. 1, I.D.1.c).

When to submit: 45 working days before the program

“All duly prepared school-based PD program proposals shall be submitted to SDO-SGOD-HRDS for quality assurance and PRC accreditation 45 working days before the implementation.” The SDO quality-assures them “within the first 15 working days”, and they are processed for PRC accreditation “within the remaining 30 working days” (Encl. 1, I.D.1.b).

Enclosure No. 1 to DM-OUHROD-2024-1576, I.D.1.b and I.G.3.a

When the proposal must reach the division office

Choose an INSET of School Year 2026-2027 to see the last day its proposal may reach the SDO, then the 15 working days of quality assurance and the 30 of PRC accreditation, and the day the completion report is due. Choose your own dates for a LAC or another program. Nothing you type is kept or sent anywhere.

Which program

Term 1 INSET: September 10, 2026 and September 11, 2026

  1. Tuesday, July 7, 2026Last day for the proposal to reach the SDO’s SGOD-HRDS, 45 working days before the first day
  2. July 7, 2026 to July 27, 2026The SDO’s quality assurance, the first 15 working days
  3. July 28, 2026 to September 9, 2026PRC accreditation, the remaining 30 working days
  4. September 10, 2026 and September 11, 2026The INSET (DO 009, s. 2026, Annex B, September 2026)
  5. Friday, September 25, 2026Completion report due at the SDO, 10 working days after the last day

Weekday holidays skipped: Ninoy Aquino Day, August 21, 2026; National Heroes Day, August 31, 2026.

Term 2 INSET: December 17, 2026 and December 18, 2026

  1. Monday, October 12, 2026Last day for the proposal to reach the SDO’s SGOD-HRDS, 45 working days before the first day
  2. October 12, 2026 to October 30, 2026The SDO’s quality assurance, the first 15 working days
  3. November 3, 2026 to December 16, 2026PRC accreditation, the remaining 30 working days
  4. December 17, 2026 and December 18, 2026The INSET (DO 009, s. 2026, Annex B, December 2026)
  5. Friday, January 8, 2027Completion report due at the SDO, 10 working days after the last day

Weekday holidays skipped: All Souls’ Day, November 2, 2026; Bonifacio Day, November 30, 2026; Feast of the Immaculate Conception of Mary, December 8, 2026; Christmas Eve, December 24, 2026; Christmas Day, December 25, 2026; Rizal Day, December 30, 2026; Last Day of the Year, December 31, 2026; New Year’s Day, January 1, 2027.

Term 3 INSET: April 2, 2027 and April 5, 2027

  1. Wednesday, January 27, 2027Last day for the proposal to reach the SDO’s SGOD-HRDS, 45 working days before the first day
  2. January 27, 2027 to February 16, 2027The SDO’s quality assurance, the first 15 working days
  3. February 17, 2027 to April 1, 2027PRC accreditation, the remaining 30 working days
  4. April 2, 2027 and April 5, 2027The INSET (DO 009, s. 2026, Annex B, April 2027)
  5. Tuesday, April 20, 2027Completion report due at the SDO, 10 working days after the last day

Weekday holidays skipped: Maundy Thursday, March 25, 2027; Good Friday, March 26, 2027; Araw ng Kagitingan, April 9, 2027.

Eid’l Fitr and Eid’l Adha of 2027 had not been proclaimed on November 23, 2026. Each one that falls on a weekday inside these counts moves a date by one working day. Eid’l Fitr, expected about March 10, 2027, falls inside this count: once it is proclaimed for a weekday, the last day for the proposal becomes Tuesday, January 26, 2027.

Source: DM-OUHROD-2024-1576, Enclosure No. 1, I.D.1.b and I.G.3.a. INSET days: DepEd Order No. 009, s. 2026, Annex B (DepEd’s copy). Holidays: Proclamation No. 1006, s. 2025; Proclamation No. 1189, s. 2026; Proclamation No. 1264, s. 2026; Proclamation No. 1427, s. 2026.

Working days are Mondays to Fridays other than the national regular holidays and special (non-working) days declared for 2026 and 2027; a local holiday or a suspension of work moves a date. The 45 days are counted back from the first day of the program, with the day the proposal arrives counted as the first: this reading is the figure’s own.

For School Year 2026-2027, the 45 working days put the Term 2 proposal’s deadline at Monday, October 12, 2026, two months before the December 17 and 18 INSET. Counting back from April 2, 2027, the Term 3 proposal must reach the SDO by Wednesday, January 27, 2027, in the fourth week of Term 3’s Instructional Block, on the holidays proclaimed so far. Eid’l Fitr of 2027, expected about March 10 and not yet proclaimed on November 23, 2026, falls inside that count; once it is proclaimed for a weekday, the date becomes Tuesday, January 26, 2027. A school should treat January 26 as its deadline. Work on it therefore starts in December: the needs come from Term 2’s records, and planning and design fill the weeks around the Term 2 INSET.

Two more things argue for sending the proposal early. A regional or local holiday on a weekday inside the count moves the date a working day earlier for that place. Cordillera Day, July 15, 2026, a special day in the Cordillera Administrative Region only, moved that region’s Term 1 deadline to Monday, July 6 (Proclamation No. 1334, s. 2026). The special days of November 16 to 18, 2026 in the National Capital Region moved its Term 2 deadline to Wednesday, October 7 (Proclamation No. 1447, s. 2026). And a proposal sent back for revision uses up the SDO’s 15 days, so a school that submits on the last day has no time to fix it.

The Term 2 completion report’s ten working days run from December 21, 2026 to January 8, 2027, and five of them fall in the Year-End Break, December 19 to 31, a wellness break for teachers (DO 009, s. 2026, Annex B). A program management team of teachers has January 4 to 8 to finish it, unless it drafts the report before the break.

PRC’s own rule explains why the 30 days matter. An “Application for accreditation of CPD Programs shall be filed at least thirty (30) working days prior to the date of CPD program offering” (PRC Resolution No. 1948, s. 2025, Sec. 1(3)). The SDO files after its own 15 days, so a late proposal cannot reach PRC in time.

PRC accreditation and CPD units

Every program quality-assured by NEAP’s Central Office, a regional office or an SDO “shall be submitted to the Professional Regulation Commission for accreditation” (Encl. 1, I.D.2.a). For school programs, the SGOD-HRDS “shall take charge of the program accreditation of PD programs developed at the SDO and school levels” (I.D.2.c). The school does not file with PRC itself.

The SDO can file because it is a CPD provider, or is meant to be. In March 2024, DepEd reported that all regional offices had become PRC-accredited providers and directed “all Schools Division Offices (SDOs)” to apply. The same memorandum set out what each SDO would process: “only quality-assured professional development programs developed by SDOs, quality-assured school-based in-service training (INSET) programs, and learning action cells developed at the school level, shall be processed for PRC accreditation at the division level” (Memorandum DM-OUHROD-2024-0410, March 7, 2024, items 2, 4 and 7). The fiscal year 2026 memorandum asks every implementing unit to submit documents to PRC for accreditation “whenever applicable” (DM-OULS-2026-179, Sec. IV.d.iii).

What accreditation gives teachers

A professional teacher needs 15 CPD units to renew the PRC identification card, and newly licensed teachers are exempt for their first three-year cycle. The Professional Regulatory Board for Professional Teachers set both rules in 2019 (PRB-PT Resolution No. 31, s. 2019, Sec. 1(b) and (c)), under Republic Act No. 10912, which makes CPD “a mandatory requirement in the renewal of the PICs” (Sec. 10). PRC accepts a CPD undertaking for renewal until December 31, 2026, and the resolution extending that acceptance refers to “the full implementation of the CPD Program beginning January 2027” (PRC Resolution No. 2200, s. 2026).

An accredited program earns units by its hours. A program’s credit units equal its “Number of Active Learning Hours X Content Evaluation Multiplier”, rounded to the nearest half unit, and opening and closing programs, registration, breaks and meals are not active hours (PRC Resolution No. 2041, s. 2025, Secs. 2.1 to 2.3). The multiplier is at most one, so a 16-hour INSET earns at most 16 units, less the hours of ceremonies and breaks.

Training that was not accredited can still count, through self-directed learning. A teacher applies for units for “institution/company-sponsored training programs” that “did not undergo CPD accreditation”, and PRC awards 3, 7, 11 or 15 units by a rubric (PRC Resolution No. 2165, s. 2026, Secs. 2.7 and 5.1). Accreditation saves every teacher that application.

Delivering the program

Only quality-assured programs are delivered, face to face, online, blended or self-paced, and each is delivered “consistent with the quality assured and PRC-accredited proposal” (Encl. 1, I.F.1 and 2). Delivery has two jobs. Program Management runs the program to the delivery standards. Learning Management delivers the competencies “according to adult-learning principles” (I.F.4). Enclosure 10 sets the standards for both.

Before and around the sessions During the sessions
The program management team (PMT) and the speakers review the quality-assured design and materials before the program The session objectives are explained at the start of each session
Dates and objectives are communicated officially; participants’ special needs are noted Speakers check understanding, ask higher-order questions and give formative assessments
The venue is accessible and safe, with facilities for persons with disabilities and enough clean toilets Speakers adjust content, method and schedule to what learners need
Breaks of “15-30 minutes mid-morning and mid-afternoon” and “one hour for lunch”; “working breaks” avoided Language is “Socially-inclusive, gender-sensitive, non-discriminatory, and non-stereotypical”
For an INSET: health personnel and a first-aid kit, the evacuation plan, healthy meals Daily attendance, documentation of proceedings, and a daily debriefing
Incidents of sexual harassment, bullying or intimidation handled “within 24 hours from receipt of the report” The end-of-day evaluation each day and the post-assessment at the end

The program opens with a management of learning: “leveling of expectations, discussion of program objectives and matrix, and agreeing on session norms”. It closes with a session to synthesize what was learned and with preparation for “re-entry to the workplace through mechanisms like the Learning Application Plan (LAP)” (Encl. 10). Certificates of appearance, participation or completion go to participants, and certificates of recognition to invited speakers.

Monitoring and the PD Compliance Monitoring Tool

Delivery “shall be monitored by the RO/SDO/School Heads” to check that the program follows its quality-assured proposal and the indicators of the PD Compliance Monitoring Tool (Encl. 1, I.G.1.a). The regional HRDD/NEAP-R and the division’s SGOD Schools Management Monitoring and Evaluation (SMME) section facilitate the monitoring of school programs, following the program’s own M&E plan (I.G.1.b).

The tool’s stated purpose is to inform a decision on the program: “(a) replicating the program; (b) improving the program; and/or (c) discontinuing the program offering” (Encl. 11). The monitor rates seven categories:

  1. Participants: whether the actual participants are the targeted ones
  2. Program design: whether the delivered program followed the quality-assured design
  3. Resource persons: whether the speakers met the learning management standards
  4. Learning resource materials: whether the materials were the quality-assured ones and reached the participants
  5. Learning evaluation scheme: whether the assessments were those submitted
  6. Program management: whether the PMT met the delivery standards
  7. Learning environment: the venue, or the online platform

Each category is marked in one of four columns, worth 4, 3, 2 and 1 points. In the first category, column A means “About 91-100% of the actual participants are the target participants”, and column D “About 50% or less”. The categories’ ratings are averaged into one, with no weights, since “All categories are considered crucial to any program”. Speakers, program management and the environment also get a rating from participants’ end-of-day evaluations (Encl. 11).

The tool prints its rating scale twice, with different words for the same bands. The first time, 3.26 to 4.0 means “Fully met all agreed standards” and 2.51 to 3.25 “Partially met agreed standards”. The second time, the same bands read “Fully met all agreed standards and Exceeded Expectations” and “Fully met all agreed standards and expectations”. The action is the same in both: a rating of 2.51 or more calls for “Feedback to program owner”, and a rating of 2.50 or less for feedback and a debriefing (Encl. 11). A separate part rates Level 2 learning by the share of participants who passed the post-assessment, from “About 91-100%” down to “50% or less”.

Evaluating the program at Kirkpatrick’s four levels

“The Kirkpatrick’s Levels of Evaluation shall be utilized in all School-based PD program” (Encl. 1, I.G.2). The M&E plan in the proposal has a row for each level, and the design checklist asks that the Level 1, 2 and 3 tools be “indicated and submitted” with it (Encl. 4; Encl. 9).

Level What the guidelines measure Tool Who When
1. Reaction “participants daily reaction towards the delivery of the program” End-of-Day Evaluation (Enclosure 7) The PMT’s M&E focal person Each day; results reported at the daily debriefing
2. Learning “the learning of the participants” The assessments in the proposal, with a pre-test and a post-test for an INSET The PMT During the program; the post-assessment at its end
3. Behavior Whether participants “were truly impacted by the learning and if they’re applying what they have learned” The Learning Action Plan The teacher’s immediate supervisor; regional, division and school heads monitor Within two quarters of an INSET; up to two months after a LAC
4. Results The program’s impact An impact assessment “per governance level” For a school’s program, the SDO’s SGOD-HRDS and SMME After the program, once teachers begin to apply their plans

Sources: Encl. 1, I.G.2.a to d and II.C.6; Encl. 10.

The sample end-of-day evaluation uses a four-point scale, from “(4) Strongly Agree” to “(1) Strongly Disagree”. It rates the session’s management and objectives, the venue, from lighting to “Facilities for individual with disabilities” and whether “Meals were sufficiently healthy”, the technology, the program management team, and the program proper, and ends with two open questions (Encl. 7). It is labeled a sample: a school may adapt it, and the checklist reviews the tool the school submits.

What each level can and cannot show

The levels do not predict one another. In a meta-analysis of 34 studies, how much trainees liked a training correlated .02 with what they learned and .07 with what they later did on the job. Ratings of how useful the training was did better, at .26 and .18 (Alliger and others, 1997). The authors’ report of the study sums it up: “liking does not equate to learning or to performing”, and “If the purpose for collecting reaction measures is to predict or indicate transfer it would be best to ask utility-oriented questions” (Alliger and others, 1998, p. 11). Most items on the sample end-of-day tool ask about the venue, the pace and the management. A school that adds two or three items on use, such as “I will use what I learned in a lesson within two weeks”, gets a Level 1 result that says more about Level 3.

A Philippine example shows the gap. Teachers who took ELLN Digital, a blended course in early language, literacy and numeracy with weekly LAC sessions, found it “valued and enjoyed”. Their content knowledge test rose from a mean of 27.72 to 28.84 out of 60, a “small but significant” gain, while their self-assessments rose by a medium effect (Oakley, King and Scarparolo, 2018, pp. 18 and 19). High reaction, small measured learning: the reason the guidelines ask for a pre-test and a post-test, and do not stop at Level 1.

Donald Kirkpatrick’s own book makes the supervisor the condition for Level 3. Of four conditions for change, the third is “the right climate”, which “refers to the participant’s immediate supervisor”, and “there is little or no chance that training will transfer to job behavior if the climate is preventing or discouraging” (Kirkpatrick and Kirkpatrick, 2006, pp. 23 to 24). The guidelines give that supervisor the job of following up each teacher’s plan.

The Learning Action Plan (Workplace Application Plan)

“The Learning Action Plan (LAP) shall be the final output in all school-based PD programs” (Encl. 1, I.G.2.c). The guidelines call it the LAP; its template, Enclosure 12, is titled the “School-Based PD Program Workplace Application Plan (WAP)”, and Enclosure 10 calls it the “Learning Application Plan (LAP)”. All three names mean one document.

The template asks for the teacher’s name, school, designation and learning area, the INSET title and dates, the “Key Result Area/s (KRA)”, described as “the focus KRA (PPST Domain) to which this Learning Action Plan will contribute”, and an application objective that begins “Back in the classroom, the teachers will be able to”. Its table has four columns:

Action steps or activities Timeline Indicators of success Support needed, and from whom
“Create a Lesson Plan integrating HOTS” “December” “3 lesson plans integrating HOTS”

The sample row is the template’s own (HOTS is higher-order thinking skills). The columns ask for steps “aligned with your regular function including special assignment”, for evidence such as “output you will be able to produce, skills you will be able to demonstrate documented by an observation form”, and for the resources and experts the teacher needs. The teacher signs it, and the immediate supervisor approves it (Encl. 12).

Program When the plan is prepared When it is carried out
INSET “Last session of 3rd day” “Within the next two quarters”
LAC “Every after LAC session” “Up to maximum of 2 months after the completion of the 5-month LAC”

Source: Encl. 1, I.G.2.c.

“The immediate supervisor of the teacher participant shall monitor and ensure that the LAP is implemented within the prescribed timeline and provide technical assistance if necessary” (I.G.2.c). In most schools that is a head teacher, a master teacher or the school head.

Both times in the table come from the calendar of 2024. The three-term calendar has no third INSET day and no quarters, and no issuance restates either. Read as calendar quarters, two quarters are six months. A teacher who prepares the plan in the INSET’s last session and carries it out during the next term stays well inside that span, and the design checklist asks that the plan be one that “can be realistically completed within an adequate period (exclusive of school breaks for teachers)” (Encl. 9).

The completion report and the repository

“The School Head together with the Program Management Team shall prepare and submit the accomplished Program Completion Report to the Schools Division Office 10 working days after the conduct of the program” (Encl. 1, I.G.3.a). The report has an executive summary with the daily proceedings, an M&E analysis of the Level 1 evaluations and the Level 2 assessments, comments and issues encountered, recommendations, photo documentation and the profile of the actual participants (I.G.3.b). Its form, Enclosure 13, asks for photos as a PDF file, “5 pictures per day only”, each day with descriptions, and attaches the Actual Participants Profile Sheet and the financial report. The program or course manager signs it, agreeing that “DepEd-NEAP to be the co-owner of all the data gathered and the copyright of any publication of the use of these data”.

The participants’ sheet, Enclosure 14, lists each participant’s name, plantilla position, sex, DepEd email address, Tax Identification Number and PRC license number. “This Form is not valid if not signed” by the school principal. It holds personal data, which the school must protect against unauthorized disclosure (Data Privacy Act of 2012, Sec. 20), so it goes only to the SDO and stays with the program’s records, never posted or shared in a group chat.

The SDO consolidates the completion reports of school programs and sends them to the regional office (Encl. 1, II.C.4).

The repository

Accredited programs are kept so that others can use them. School-developed programs go to an “SDO-managed repository”, and the school head “shall manage the repository of quality-assured and PRC-accredited school-based PD programs” (Encl. 1, I.E.1.c; II.D.6). Keeping the school’s own file of each program, and depositing a copy with the SDO, satisfies both lines.

Designs in a repository “may be made available for adaption and reference”. A school that adapts one still runs the whole cycle: such a proposal “shall undergo the complete PD program development cycle” (I.E.2 and 3). An adapted design saves the writing, not the needs assessment, the quality assurance or the evaluation.

Who does what: school, division, region and Central Office

Part II of the guidelines gives each level its terms of reference.

Level Office What it does under the guidelines
School School head, with the assistant principal, head teachers and master teachers Plans, designs and develops programs from teachers’ prioritized needs; reviews proposals and endorses them to the SDO; manages delivery; monitors and evaluates teachers’ action plans; prepares and submits the completion report; manages the school’s repository
Schools division office SGOD-HRDS, with the Curriculum Implementation Division (CID) and SGOD-SMME Quality-assures school-developed programs; processes their PRC accreditation; monitors and evaluates their implementation; consolidates completion reports for the region; manages the SDO repository; with SMME, conducts the impact assessment
Regional office Human Resource Development Division/NEAP in the Region (HRDD/NEAP-R), with the CLMD and QAD With SGOD-SMME, facilitates the monitoring of school-based programs; designs regional programs; quality-assures SDO-developed programs; monitors them; consolidates SDO completion reports for NEAP; manages the regional repository
Central Office NEAP Monitors and evaluates the guidelines’ implementation; gives technical assistance; manages the repository of regional programs

Source: Encl. 1, II.A to D.

Paying for school-based INSET and LAC

The 2024 memorandum set out to guide “the proper utilization of FY 2024 Human Resource Development (HRD)/Maintenance and Other Operating Expenses (MOOE)/local funds for school-based professional development programs” (DM-OUHROD-2024-1576, item 2.a), and left the rules on spending to the fiscal year 2024 HRD fund guidelines (item 10). The money for in-service training reaches divisions, not schools. Under DepEd Order No. 030, s. 2021, INSET funds are released by the Department of Budget and Management to the SDOs, and in 2021 the fund was “computed as five percent (5%) of the total School Maintenance and Other Operating Expenses (MOOE) of public elementary schools” (item 11.c.ii).

For 2026, PhP 1,564,638,000 “for In-Service Training is appropriated under the Human Resource Development for Personnel in Schools and Learning Centers (HRDPSLC) Fund in the FY 2026 General Appropriations Act (GAA) and is directly released to School Division Offices” (DM-OULS-2026-179, Sec. IV.a). Its uses include the design, delivery, quality assurance and M&E of programs, and “Provision of technical assistance to SDOs and schools on conducting LAC sessions and collaborative expertise sessions” (Sec. IV.b). The allowable expenses are board and lodging and the use of function rooms and equipment, transport and per diem, supplies and printing, quality assurance and M&E costs, and “Professional fees or honoraria of non-DepEd resource persons, in accordance with DBM Budget Circular No. 2007-01 and other relevant issuances” (Sec. IV.g).

A school’s own MOOE may also pay for a school-based INSET. NEAP’s guidelines for the School Year 2025-2026 INSET said so: “The expenses for school-based INSET may also be funded through the Maintenance and Other Operating Expenses (MOOE), in accordance with DepEd Order No. 008, s. 2019” (DM-OULS-2025-095, item 7). No memorandum for School Year 2026-2027 restates it, and the MOOE order itself governs: school MOOE funds activities “as identified in the approved School Improvement Plan (SIP)” and “as specifically determined in the Annual Implementation Plan (AIP)” (DepEd Order No. 8, s. 2019, Sec. V.D.1). An INSET or LAC paid from MOOE belongs in the AIP.

The budget matrix (Enclosure 8) is the form for the estimate: the program title, the learning service provider, the platform, the source of funds, the number of participants, the dates and venue, then each item by participants, days and unit cost, with the total for each batch. The design checklist asks that the cost per participant be “within the allowable limits according to government budgeting, accounting, and auditing rules and regulations” (Encl. 9).

What research says about professional development that works

A program works through what it makes teachers do. A meta-analysis for England’s Education Endowment Foundation found an average effect of teacher PD on pupils’ test scores of .05 standard deviations, “approximately one month of additional pupil progress”. It grouped 14 mechanisms under four purposes: building insight, motivating goals, teaching techniques, and embedding practice. “Programmes incorporating zero mechanisms have effect sizes around zero”, while those with almost all 14 reached about .17 (Sims and others, 2021, pp. 5, 6 and 21). The last group, embedding practice, includes action planning, prompts and repetition in context: the Learning Action Plan is one of them. The review notes that three other meta-analyses found no link between longer programs and larger effects (p. 54), and it found weaker effects in trials registered in advance, so its numbers are best read as directions, not guarantees.

Coaching after the training adds to it. Across 60 studies with causal designs, coaching improved instruction by 0.49 and achievement by 0.18 standard deviations, and coaching paired with group training did better than coaching alone. Programs with fewer than 100 teachers had about twice the effect on instruction of larger ones (Kraft, Blazar and Hogan, 2018). EDCOM II’s final report calls for “systematic follow-up and application support”, citing the World Bank’s finding that “follow-up visits that include school-based coaching to reinforce training are among the most effective characteristics of professional development programs” (EDCOM II, 2026, p. 282). A school-based program is small by nature, and its immediate supervisors are in the building.

Coaches who plan with teachers do better than coaches who check them. Reviewing 28 studies, Mary Kennedy found that coaches in less effective programs “tended to observe and evaluate teachers for how well they complied with an observation rubric, whereas coaches in more effective programs collaborated with teachers on lesson planning” (Kennedy, 2016, p. 972). She also found an average effect of .16 where volunteers took part and .03 where attendance was mandated: “Attendance is mandatory but learning is not” (p. 973). A school INSET is mandatory; Kennedy’s finding is a reason to build it on the problems teachers themselves report.

Large government programs drop the parts that work. A World Bank review of programs in developing countries found larger learning gains where training had a specific subject focus, included practice of lessons, began face to face and was linked to career incentives. The 139 government programs it surveyed had “fewer opportunities to practice new skills, and less follow-up once teachers return to their classrooms” (Popova and others, 2022, abstract). EDCOM II found the same weakness at the national level: NEAP lacks “clear priorities, a strategic framework, and systematic monitoring and evaluation” (EDCOM II, 2026, p. 292). The school-level cycle puts the follow-up and the evaluation in the school’s hands.

There is no magic number of hours. A 2007 review for the US Institute of Education Sciences is often quoted for a threshold of 14 hours, but its nine studies were all of elementary teachers, and its authors wrote that discerning “any pattern in these characteristics and their effects on student achievement is difficult” (Yoon and others, 2007, p. iv). The 16 hours a term in DO 009, s. 2026 are a calendar rule, not a research finding.

What this means for school heads

The cycle maps onto Strand 4.5 of the Philippine Professional Standards for School Heads (PPSSH), Professional development of school personnel. At Career Stage 1 a school head is to “Demonstrate knowledge and understanding of professional development in enhancing strengths and in addressing performance gaps among school personnel” (4.5.1), and at Career Stage 2 to “Implement professional development initiatives to enhance strengths and address performance gaps among school personnel” (4.5.2) (DepEd Order No. 024, s. 2020). The Domain 4 guide covers the strand’s neighbors, and the cycle’s planning draws on Strand 1.2, School planning and implementation.

For the Term 3 INSET of April 2 and 5, 2027, the year runs like this:

  1. Late November and December 2026: the needs. With the assistant principal, head teachers and master teachers, gather Term 2’s classroom observation results, coaching forms, IDPs and learners’ assessment results. List the needs, rank them with the Enclosure 3 matrix, and map the top ones to PPST indicators.
  2. December 1 to 16, 2026 and January 4 to 22, 2027: the plan and the design. December 19 to 31 is the Year-End Break. Name the program management team and its terms of reference. Write the INSET plan for two days and 16 hours, with each session’s objectives, methods, assessments and outputs, the M&E plan for all four levels, the pre-test and post-test, the LAP template and the budget matrix. Collect each resource person’s CV. If MOOE pays, put the INSET in the AIP.
  3. By Tuesday, January 26, 2027: the review and the endorsement. Check the packet against the 32 standards of Enclosure 9, then endorse it to the SDO’s SGOD-HRDS. Sending it a week or two early leaves time for a revision within the SDO’s 15 days.
  4. April 2 and 5, 2027: the delivery. Run the opening management of learning, the daily attendance and debriefing, the end-of-day evaluation with a few questions on use, and the post-test. Each teacher finishes a LAP in the last session.
  5. By April 20, 2027: the completion report, with the Level 1 and Level 2 analysis, the photos, the signed participants’ sheet and the financial report.
  6. Term 1 of School Year 2027-2028: the plans at work. Term 3 ends on April 8, 2027, three days after the INSET, and the teachers’ end-of-year break follows. Each immediate supervisor follows the teachers’ plans with visits and coaching. Their results and the completion report feed the next needs assessment.

The records to keep in the school’s own repository: the needs data and the matrix, the endorsed packet with its Certificate of Quality Assurance, attendance, the daily evaluations and debriefing notes, pre-test and post-test results, each teacher’s approved LAP and the supervisor’s notes on it, and the completion report.

A school may adapt a design from the SDO’s repository, but the adapted proposal still goes through the whole cycle (Encl. 1, I.E.3). It may adapt the sample end-of-day tool. It may not run a program that failed quality assurance as an official DepEd program (I.D.1.c), and it delivers the program as approved (I.F.2). The learning action cell guide and The 70-20-10 Model for Teachers in DepEd Schools show how INSET, LAC sessions, coaching and the work itself fit together in a teacher’s year, and the guide to the End-of-Term Block sets the INSET days among the block’s other work.

Frequently asked questions

What is a school-based INSET in DepEd?

It is an in-service training that a school plans, designs, delivers and evaluates for its own teachers, built on their ranked needs. Under NEAP’s guidelines, its proposal is quality-assured by the SDO and accredited by PRC before it runs (Enclosure No. 1 to DM-OUHROD-2024-1576, I.D). The guidelines remain in force through DM-OULS-2026-179, Sec. IV.f.

How many days is the INSET in School Year 2026-2027?

Two days in each of the three End-of-Term Blocks, 16 hours a term: 48 hours over the year, above DO 009’s minimum of 32. The days are September 10 and 11, 2026, December 17 and 18, 2026, and April 2 and 5, 2027 (DO 009, s. 2026, para. 21; Annex A, Days 7-8; Annex B).

When must a school submit its INSET proposal to the division office?

The proposal must reach the SDO’s SGOD-HRDS 45 working days before the program: 15 working days for quality assurance and 30 for PRC accreditation (Encl. 1, I.D.1.b). For the April 2 and 5, 2027 INSET, that is Wednesday, January 27, 2027 on the holidays proclaimed so far, and Tuesday, January 26 once Eid’l Fitr 2027, expected about March 10, is proclaimed. Send it by January 26.

What is the difference between a LAP and a WAP?

None: they are one document. The guidelines call it the Learning Action Plan (LAP), and its template is titled the Workplace Application Plan (WAP). It is each teacher’s plan for applying what was learned, approved by the immediate supervisor and carried out within the next two quarters after an INSET, or up to two months after a five-month LAC (Encl. 1, I.G.2.c; Encl. 12).

Do school-based INSET and LAC sessions earn CPD units?

An accredited one does: the SDO’s SGOD-HRDS processes school programs for PRC accreditation (Encl. 1, I.D.2.c), and units follow the active learning hours (PRC Resolution No. 2041, s. 2025, Secs. 2.1 to 2.3). A training that was not accredited may still earn units through PRC’s self-directed learning application (PRC Resolution No. 2165, s. 2026, Secs. 2.7 and 5.1).

Sources

DepEd issuances

Laws, proclamations and PRC resolutions

Reports on Philippine schools

Research on training evaluation and teacher development

Written by Mark Anthony Llego for NASH Reviewer. Sources: Memoranda DM-OUHROD-2024-1576 and its Enclosures 1 to 14, DM-OULS-2026-179, DM-OULS-2025-095 and DM-OUHROD-2024-0410; DepEd Orders No. 006, 009 and 014, s. 2026, 005, s. 2024, 030, s. 2021, 024, s. 2020, 8, s. 2019 and 35, s. 2016; DepEd Memorandum No. 044, s. 2023; RA 10912; Proclamations No. 1006, s. 2025 and 1189, 1264, 1334, 1427 and 1447, s. 2026; RA 10173; PRC and PRB-PT resolutions; EDCOM II (2026); World Bank (2016); Oakley, King and Scarparolo (2018); Kirkpatrick and Kirkpatrick (2006); Alliger and others (1997, 1998); Kepner and Tregoe; Sims and others (2021); Kraft, Blazar and Hogan (2018); Kennedy (2016); Popova and others (2022); Yoon and others (2007).