Grade 12 Domestic Refrigeration and Air-Conditioning Servicing Budget of Work
Grade 12 Domestic Refrigeration and Air-Conditioning Servicing budget of work for SY 2026-2027: DepEd's 9 learning competencies by week, in no set term.
DepEd places each competency in its weeks and names no term.
DepEd lists it under TechPro Electives / Industrial Technologies.
DepEd's Grade 12 budgets of work are for its strengthened senior high school curriculum, which in SY 2026-2027 only the schools that piloted it in Grade 11 in SY 2025-2026 teach in Grade 12. Grade 12 in every other school follows the 2016 K to 12 senior high school curriculum in SY 2026-2027, and every school moves Grade 12 to the strengthened curriculum in SY 2027-2028 (DO 017, s. 2026, para. 7; DM 036, s. 2026, para. 4).
On this page
At a glance
Counted by NASH Reviewer from DepEd's file.
| Part | Weeks | Competencies |
|---|---|---|
| Weeks | 1 to 10 | 9 |
DepEd's notes
Please note that each Tech-Pro elective is completed within one term if delivered at Grade 12.
Weeks
- Elective
- Domestic Refrigeration and Air-Conditioning Servicing
- Prerequisite
- None
- Performance standard
The learner performs the installation of domestic refrigeration and air-conditioning units with safety precautions.
- Content standard
Understands the concepts and principles of installing domestic refrigeration and air-conditioning units.
Week 1
Discuss overview of Refrigeration and Air Conditioning servicing.
Suggested activities, Week 1
Service Cycle Exploration
- Learners study the basic steps and sequence of refrigeration and air conditioning servicing, including maintenance and troubleshooting tasks.
- Observe a demonstration or video of the service cycle, then identify and list the key steps involved.
Servicing Tools Identification
- Learners identify common tools and equipment used in refrigeration and air conditioning servicing.
- Examine each tool, describe its purpose, and demonstrate correct handling.
Week 2
Discuss refrigeration and air conditioning concepts and principles.
Suggested activities, Week 2
Principle Mapping
- Learners explore key concepts like the refrigeration cycle, heat transfer, and thermodynamic principles used in air conditioning systems.
- Create a concept map showing components, flow of refrigerant, and energy transfer in a refrigeration system.
Case Study Analysis
- Learners analyze real-world air conditioning problems to understand practical applications of refrigeration principles.
- Review a case study of a malfunctioning AC system and explain which principles are involved in diagnosing the problem.
Week 3
Perform pre-installation procedure for an air- conditioning unit.
Suggested activities, Week 3
Site Inspection Drill
- Learners assess the installation site for window or split-type AC units, checking measurements, power supply, and support structures.
- Inspect the designated site, measure openings, and verify electrical and structural requirements before installation.
Component Preparation
- Learners prepare AC unit components (filters, brackets, screws, electrical wires) for installation.
- Collect, organize, and inspect all AC components to ensure readiness for installation.
Week 4
Perform procedures in installing a window-type air-conditioning unit.
Suggested activities, Week 4
Mounting Practice
- Learners practice mounting a window-type AC unit securely in a frame or window opening.
- Position the AC unit in the window opening, level it, and secure it using brackets and screws.
Electrical and Functional Check
- Learners connect the AC unit to a power supply and verify correct operation, cooling, and safety features.
- Plug in the unit, turn it on, and check for proper cooling, airflow, and safe electrical function.
Suggested performance tasks, after Week 4
Individual Performance Task - Window-Type AC Installation
- Each learner independently installs a window-type air-conditioning unit, ensuring correct placement, secure mounting, proper electrical connection, and adherence to safety procedures.
- Measure and prepare the installation site, mount the unit securely, connect the power supply safely, and test for proper operation.
Group Performance Task - Domestic Refrigerator Setup Project
- In groups, learners collaboratively install a domestic refrigeration unit, dividing tasks such as positioning, leveling, electrical connection, and safety checks, ensuring proper installation and operation.
- Work as a team to position the refrigerator, connect power safely, verify leveling and clearance, and test all functions according to safety standards.
Week 5
- Performance standard
The learner performs the maintenance of domestic refrigeration and window-type air- conditioning units with safety precautions.
- Content standard
Understands the concepts and principles of maintaining domestic refrigeration and window-type air-conditioning units.
Perform maintenance of window-type air- conditioning units.
Suggested activities, Week 5
Air Filter and Coil Cleaning
- Learners clean and inspect the air filters and evaporator/condenser coils to ensure proper airflow, efficiency, and unit longevity.
- Remove the filters and coils, clean them using water, brushes, or compressed air, inspect for damage, and reinstall correctly.
Electrical and Drainage System Check
- Learners inspect the unit’s electrical connections, controls, and drainage system to ensure safe operation and proper water flow.
- Check wiring and terminals, test fan and thermostat functions, and clear the drain pan and pipe of debris.
Suggested performance tasks, after Week 5
Individual Performance Task - Routine AC and Refrigerator Maintenance
- Each learner independently performs routine maintenance on a domestic refrigerator or window-type AC unit, including cleaning filters, coils, and drainage, and checking electrical connections safely.
- Follow a step-by-step maintenance procedure, clean and inspect all components, and ensure proper operation while observing safety precautions.
Group Performance Task - Comprehensive Maintenance Workshop
- In groups, learners collaboratively perform full maintenance on multiple refrigeration and AC units, dividing tasks such as coil cleaning, filter replacement, electrical inspection, and drainage verification, while following safety protocols.
- Work as a team to perform thorough maintenance on assigned units, checking all mechanical and electrical systems, and confirm proper operation safely.
Week 6
- Performance standard
The learner performs troubleshooting of domestic refrigeration and window-type air- conditioning units with safety precautions.
- Content standard
Understands the concepts and principles of troubleshooting domestic refrigeration and window-type air-conditioning units.
Discuss pre-troubleshooting of domestic refrigeration and window-type air conditioning units.
Suggested activities, Week 6
Common Fault Identification
- Learners study typical problems in domestic refrigerators and window-type AC units, such as poor cooling, strange noises, leaks, and electrical issues.
- Examine demonstration units or case examples and list common faults, their possible causes, and observable symptoms.
Troubleshooting Checklist Creation
- Learners develop a pre-troubleshooting checklist to guide systematic inspection before performing maintenance or repairs.
- Create a step-by-step checklist covering electrical, mechanical, and operational aspects of the units to identify potential issues efficiently.
Weeks 7 - 8
Perform troubleshooting of domestic refrigeration and window-type air-conditioning units.
Suggested activities, Weeks 7 - 8
Fault Diagnosis Drill
- Learners identify and diagnose common operational problems in domestic refrigerators and window-type AC units, such as cooling issues, leaks, or abnormal noises.
- Inspect the unit, test electrical and mechanical components, and determine the root cause of the malfunction.
Problem-Solving Simulation
- Learners simulate troubleshooting scenarios to practice correcting faults safely, including replacing or repairing defective components.
- Follow a systematic troubleshooting sequence using the checklist, perform necessary repairs or adjustments, and verify the unit operates correctly.
Suggested performance tasks, after Weeks 7 - 8
Individual Performance Task - Fault Diagnosis Challenge
- Each learner independently troubleshoots a malfunctioning domestic refrigerator or window-type AC unit, identifying electrical, mechanical, or operational faults while following safety protocols.
- Inspect the unit systematically, test components, identify the root cause of the problem, and record findings safely.
Group Performance Task - Collaborative Troubleshooting Exercise
- In groups, learners work together to troubleshoot multiple refrigeration and AC units, sharing responsibilities such as checking circuits, testing compressors, and verifying airflow, ensuring safe procedures throughout.
- Divide tasks among team members to diagnose all system components, identify faults, and recommend corrective actions while observing all safety precautions.
Week 9
- Performance standard
The learner performs repairing domestic refrigeration and window-type air-conditioning units with safety precautions.
- Content standard
Understands the concepts and principles of repairing domestic refrigeration and window-type air-conditioning units.
Understands the concepts and principles of repairing domestic refrigeration and window-type air-conditioning units.
Suggested activities, Week 9
Component Repair Analysis
- Learners study the repair procedures for common components of domestic refrigerators and window-type AC units, such as compressors, thermostats, fans, and coils.
- Examine sample components, identify possible faults, and explain step-by-step repair methods and safety precautions.
Repair Procedure Demonstration
- Learners observe and discuss actual repair techniques for refrigeration and AC units, including replacing faulty parts and restoring proper operation.
- Watch a guided demonstration of repairs, take notes on procedures and tools used, and explain the sequence of steps required for safe and effective repair.
Week 10
Perform repairing of domestic refrigeration and window-type air-conditioning units.
Suggested activities, Week 10
Component Replacement Practice
- Learners practice repairing defective components such as thermostats, compressors, fans, and electrical connections in refrigeration and window-type AC units.
- Identify the faulty component, safely remove it, replace it with a new or repaired part, and reassemble the unit correctly.
Functional Restoration Drill
- Learners perform end-to-end repair procedures, ensuring the refrigeration or AC unit is restored to proper operation and tested for safety and efficiency.
- Follow a step-by-step repair sequence, test all functions, and verify that cooling, airflow, and electrical systems operate correctly.
Suggested performance tasks, after Week 10
Individual Performance Task - Component Repair Challenge
- Each learner independently repairs a defective component (e.g., thermostat, fan, compressor, or electrical connection) in a domestic refrigerator or window-type AC unit while following safety protocols.
- Identify the faulty component, perform the repair or replacement safely, and test the unit to ensure proper operation.
Group Performance Task - Full-System Repair Project
- In groups, learners collaboratively repair multiple refrigeration or AC units, dividing tasks for diagnosing faults, replacing defective parts, and restoring full functionality safely.
- Work as a team to troubleshoot, repair, and test each unit, ensuring all electrical and mechanical systems are safely restored to proper operation.
For school heads
School heads lead qualitative reviews of lesson plans "to ensure alignment with curriculum standards and learner needs", and the findings are the basis for coaching (DO 016, s. 2026, para. 37(b)). With a plan beside this page, a head can check these points.
- The competency the plan names appears on this page, in this elective's list. A plan identifies "the learning competencies to be targeted during the learning session" (DO 016, s. 2026, para. 7(a)(i)).
- This file names no term. Ask when the school schedules this elective, and count the weeks on this page from its start.
- Compare the plan's week with the weeks this page gives its competency. A plan ahead or behind is a question to ask about pacing, not a fault: DO 009, s. 2026 intends the budget of work as "a guiding reference only for teachers in lesson planning" (para. 25).
- Before the elective ends, compare the competencies the plans have taught with the list here; one not yet taught is something to plan with the teacher. Reports to parents reflect "the competencies covered" (DO 009, s. 2026, para. 28).
- Where the plan quotes content or performance standards, check that they are the last ones printed before its weeks on this page: this file prints a pair over each unit of weeks. Annex B of DO 016, s. 2026 asks for the content or performance standards "applicable to the sessions", but the order's framework names the competencies, not the standards, so leaving them out is no fault (paras. 7 and 10).
Guides
- DO 016, s. 2026: what a lesson plan holds, and how a school head reviews plans and coaches
- Writing an ILAW lesson plan, part by part, with three sample plans
- From curriculum to lesson: unpacking a competency, and the budget of work as a guide to pacing
- DO 015, s. 2026: summative tests, the term examination and what a school head checks
- The three-term school calendar: term dates, test dates and the End-of-Term Block
More Grade 12 budgets of work in Industrial Technologies
- Commercial Air Conditioning and Servicing
- Electrical Installation and Maintenance
- Electronic Products Assembly and Servicing
- Mechatronics
- Photovoltaic Systems Installation
- Grade 12 Budgets of Work
Grade 11's file for this elective: Domestic Refrigeration and Air-Conditioning Servicing.
About this page
A teacher's lesson plan names its competencies from the curriculum, and this budget of work is a guide to the weeks each one takes. The budget of work's text on this page is DepEd's, as DepEd prints it in its PDF, which DepEd last updated on Jun 19, 2026; this copy was made from that PDF on Nov 16, 2026 by a program and checked against it. The lines under the title, At a glance, For school heads, the links under "More Grade 12 budgets of work in Industrial Technologies", this section, and labels such as "Week" and "Content standard" are NASH Reviewer's.
NASH Reviewer is not affiliated with DepEd, and these pages are free. For the official text, open DepEd's PDF.
If a line here differs from DepEd's PDF, write to support@nash.com.ph.