Skip to content
NASH Reviewer

Grade 12 Photovoltaic Systems Installation Budget of Work

Grade 12 Photovoltaic Systems Installation budget of work for SY 2026-2027 (TechPro Electives): DepEd's 12 learning competencies by week, in no set term.

DepEd places each competency in its weeks and names no term.

DepEd lists it under TechPro Electives / Industrial Technologies.

DepEd's Grade 12 budgets of work are for its strengthened senior high school curriculum, which in SY 2026-2027 only the schools that piloted it in Grade 11 in SY 2025-2026 teach in Grade 12. Grade 12 in every other school follows the 2016 K to 12 senior high school curriculum in SY 2026-2027, and every school moves Grade 12 to the strengthened curriculum in SY 2027-2028 (DO 017, s. 2026, para. 7; DM 036, s. 2026, para. 4).

Published Updated

At a glance

Counted by NASH Reviewer from DepEd's file.

PartWeeksCompe­tencies
Weeks1 to 1012

DepEd's notes

Please note that each Tech-Pro elective is completed within one term if delivered at Grade 12.

Weeks

Elective
Photovoltaic Systems Installation
Prerequisite
None
Performance standard

The learners perform site assessment with safety precautions.

Content standard

The learners demonstrate an understanding of the concepts and principles of solar energy systems in Photovoltaic (PV) Systems Installation.

Week 1

  • Discuss the concepts and principles related to Photovoltaic Systems Installation.

Suggested activities, Week 1
  • Solar Energy System Exploration

    • Learners examine the basic components of a photovoltaic (PV) system (solar panels, inverter, charge controller, battery, and wiring) and understand how sunlight is converted into electrical energy.
    • Present a PV system diagram or actual components and ask learners to explain the function of each part and how energy flows through the system.
  • Solar Power Application Case Study

    • Learners analyze real-life applications of photovoltaic systems in homes, schools, and communities to understand their advantages and limitations.
    • Assign groups to study a PV installation example and present how the system generates electricity and supports energy needs.

Week 2

  • Discuss checklist for installation parameters.

Suggested activities, Week 2
  • PV Installation Checklist Development

    • Learners identify key installation parameters such as location, roof orientation, shading, structural safety, and electrical requirements.
    • Ask learners to create a step-by-step installation checklist based on standard PV system installation guidelines.
  • Installation Readiness Inspection Activity

    • Learners simulate the inspection of a site using a prepared checklist to determine if the location meets photovoltaic installation requirements.
    • Provide a sample site scenario and guide learners in completing an installation parameter checklist.

Week 3

  • Perform site assessment procedures.

Suggested activities, Week 3
  • School-Based Solar Site Assessment

    • Learners conduct a practical site assessment within the school campus to identify suitable areas for solar panel installation.
    • Using a guide sheet, instruct learners to evaluate roof direction, shading conditions, and available installation space.
  • Solar Measurement and Data Collection Activity

    • Learners measure and record environmental factors such as sunlight exposure, tilt angle, and potential shading using simple tools.
    • Provide measuring tools and have learners document site data needed for photovoltaic system planning.

Week 4

  • Report completion of work.

Suggested activities, Week 4
  • PV Installation Work Documentation

    • Learners prepare a structured report summarizing the steps performed during the simulated installation or site assessment activity.
    • Ask learners to complete a work accomplishment report including procedures performed, tools used, and observations.
  • Technical Presentation of Work Output

    • Learners present the results of their PV installation or site assessment activity to demonstrate understanding of the process and outcomes.
    • In groups, instruct learners to present their completed work report and explain the procedures followed and findings.
Suggested performance tasks, after Week 4
  • Individual Task: “Safe Site Inspector”

    • Learners individually conduct a basic site safety assessment of a designated workshop area or simulated construction site to identify potential hazards and evaluate safety compliance.
    • Inspect the assigned site area using a safety checklist, identify at least five hazards, and document recommended safety precautions in a short report.
  • Group Task: “Team Site Safety Assessment”

    • Learners work in groups to perform a comprehensive site assessment, analyzing hazards, safety risks, and preventive measures, then presenting their findings.
    • In groups, assess a simulated worksite, identify hazards, demonstrate proper safety precautions, and present your safety improvement plan to the class.

Weeks 4-5

Performance standard

The learners perform PV components inspection with safety precautions.

Content standard

The learners demonstrate an understanding of the concepts and principles of solar energy system in Photovoltaic (PV) Systems Installation.

  • Perform inspection of PV components, materials and measuring instruments compliance.

Suggested activities, Weeks 4-5
  • PV Components Compliance Inspection

    • Learners examine photovoltaic system components such as solar panels, mounting structures, cables, connectors, and protective devices to verify if they meet basic installation and safety standards. The activity helps students become familiar with identifying compliant and non-compliant materials used in PV installations.
    • Provide sample PV components and an inspection checklist, then ask learners to inspect each item and record whether it meets the required specifications and safety standards.
  • Measuring Instruments Accuracy Check

    • Learners inspect and verify the condition and functionality of measuring instruments commonly used in PV installations such as multimeters, clamp meters, and solar irradiance meters. This activity strengthens learners’ understanding of proper tool handling and calibration awareness.
    • Demonstrate proper instrument use and have learners check the operational condition, safety features, and accuracy of assigned measuring tools using a verification checklist.

Week 6

  • Conduct reporting of test results of PV components and materials.

Suggested activities, Week 6
  • PV Testing Data Recording and Analysis

    • Learners perform simple tests on PV components such as measuring voltage output, continuity of cables, or resistance of connectors, then record and interpret the results using a structured reporting format.
    • After conducting the test procedures, instruct learners to document the measurements, interpret the results, and summarize their findings in a standard test report form.
  • Technical Reporting and Presentation

    • Learners prepare and present a brief technical report explaining the test procedures conducted, results obtained, and whether the components passed or failed inspection criteria.
    • Ask learners to prepare a short written report and present their test findings to the class using charts, tables, or diagrams.
Suggested performance tasks, after Week 6
  • Individual Task: “PV Component Safety Check”

    • Learners individually inspect photovoltaic (PV) system components (e.g., solar panels, wiring, connectors, and mounting structures) to identify defects, damage, or safety hazards while applying proper safety precautions.
    • Using a provided inspection checklist and proper PPE, examine the assigned PV components and record any defects, hazards, and recommended corrective actions
  • Group Task: “Solar Site Inspection Team”

    • Learners work collaboratively to conduct a systematic inspection of a simulated or actual PV installation, assessing the condition, safety, and functionality of different PV system components.
    • In groups, inspect a PV installation using safety procedures, document component conditions, and present a brief inspection report with recommended safety improvements.

Week 6

Performance standard

The learners perform photovoltaic (solar energy) systems installation with safety.

Content standard

The learners demonstrate an understanding of the concepts and principles of Photovoltaic (Solar Energy) Systems Installation.

  • Discuss safety protocols for PV systems installation.

Suggested activities, Week 6, part 2
  • PV Installation Safety Scenario Analysis

    • Learners analyze common workplace hazards during photovoltaic system installation such as electrical shock, falls from height, improper tool use, and weather-related risks, and identify appropriate safety protocols and personal protective equipment (PPE).
    • Present several safety scenarios related to PV installation and ask learners to identify the hazard and recommend the correct safety protocol and PPE.
  • Safety Demonstration and PPE Inspection

    • Learners examine and demonstrate the proper use of safety equipment used in PV installations such as gloves, safety harness, helmet, insulated tools, and lockout procedures.
    • Provide PPE and safety tools and ask learners to demonstrate the correct safety preparation steps before starting a PV installation task.

Week 7

  • Determine the PV installation layout, tools, and materials.

Suggested activities, Week 7
  • PV System Layout Planning Activity

    • Learners design a simple photovoltaic installation layout for a small house or building, identifying panel placement, wiring routes, inverter location, and mounting structures.
    • Provide a sample house or roof plan and ask learners to draw and label the proposed PV installation layout.
  • Tools and Materials Identification Workshop

    • Learners identify and classify the tools, materials, and equipment required for photovoltaic system installation such as solar panels, mounting brackets, cables, multimeters, and connectors.
    • Display various installation tools and materials and instruct learners to categorize them according to their function in the PV installation process.

Week 8

  • Perform installation of photovoltaic systems

Suggested activities, Week 8
  • Simulated PV System Assembly

    • Learners perform a step-by-step assembly of a basic photovoltaic system setup including panel connection, mounting structure preparation, and wiring connections in a controlled learning environment.
    • In groups, instruct learners to assemble a basic PV system model following the standard installation procedure and safety guidelines.
  • Wiring and Connection Practice

    • Learners practice connecting PV components such as panels, charge controllers, batteries, and inverters using proper wiring techniques.
    • Provide PV training kits and guide learners in completing the required electrical connections based on a given system diagram.

Week 9

  • Report completion of work.

Suggested activities, Week 9
  • Installation Work Accomplishment Report

    • Learners prepare a formal work completion report summarizing the installation steps performed, tools used, materials installed, and challenges encountered during the activity.
    • Ask learners to complete a structured work report template documenting the installation process and results.
  • Post-Installation Technical Presentation

    • Learners present the completed PV installation activity to demonstrate understanding of the procedures and evaluate the success of the installation process.
    • In groups, instruct learners to present their installation output and explain the steps performed, safety measures followed, and system functionality.
Suggested performance tasks, after Week 9
  • Individual Task: “Solar Panel Mounting Practice”

    • Learners individually demonstrate the proper installation of a photovoltaic panel on a mounting structure, applying correct procedures and observing safety precautions such as the use of PPE and safe handling of tools and components.
    • Install a photovoltaic panel on the provided mounting frame using proper tools and PPE while following the correct safety and installation procedures.
  • Group Task: “Mini Solar System Installation Project”

    • Learners work in groups to install a small-scale photovoltaic system, including panel placement, basic wiring connections, and safety checks, simulating a real installation process.
    • In groups, install a mini photovoltaic system by mounting the panel, connecting the basic components, and demonstrating proper safety practices during the installation.

Week 9

Performance standard

The learners perform commissioning of photovoltaic (solar energy) system with safety precautions.

Content standard

The learners demonstrate an understanding of the concepts and principles of Photovoltaic (Solar Energy) Systems

  • Apply commissioning procedures on wiring, grounding, and system components.

Suggested activities, Week 9, part 2
  • PV System Commissioning Simulation

    • Learners perform a simulated commissioning process on a small photovoltaic (PV) training setup, checking wiring connections, grounding continuity, polarity, and component installation based on a standard commissioning checklist.
    • Provide learners with a PV training kit and commissioning checklist and let them inspect wiring, grounding, and components before documenting whether the system passes commissioning standards.
  • Fault Detection and Correction Activity

    • The instructor intentionally installs common wiring and grounding faults in a PV training setup, and learners identify and correct these issues using proper commissioning procedures and testing tools.
    • Ask learners to test the PV system using a multimeter and inspection checklist to locate faults in wiring, grounding, or components and correct them following commissioning procedures.

Week 10

  • Manage the results of commissioning photovoltaic systems.

Suggested activities, Week 10
  • Commissioning Report Preparation

    • Learners analyze the results gathered during system commissioning and prepare a professional commissioning report summarizing test results, system performance, identified issues, and recommended actions.
    • Provide a commissioning data template and instruct students to organize collected inspection and test results into a formal PV system commissioning report.
  • Commissioning Results Presentation and Evaluation

    • Learners present their commissioning findings to the class, explain system performance, and propose corrective actions or maintenance recommendations.
    • Let each group present their commissioning results using charts or slides and justify whether the PV system is ready for operation based on the test outcomes.
Suggested performance tasks, after Week 10
  • Individual Task: “PV System Commissioning Check”

    • Learners individually perform the basic commissioning procedures of a photovoltaic system, such as checking electrical connections, measuring voltage output, and verifying system readiness while observing proper safety precautions and using appropriate testing tools.
    • Using proper PPE and testing tools, perform a commissioning check on the assigned PV system and record the system’s operational readings and safety observations.
  • Group Task: “Solar System Start-Up and Commissioning Project”

    • Learners work in groups to carry out the commissioning process of a photovoltaic system, including system inspection, start-up procedures, performance verification, and documentation of safety compliance.
    • In groups, conduct the commissioning and start-up of a PV system, verify system performance, and present a brief commissioning report following safety procedures.

For school heads

School heads lead qualitative reviews of lesson plans "to ensure alignment with curriculum standards and learner needs", and the findings are the basis for coaching (DO 016, s. 2026, para. 37(b)). With a plan beside this page, a head can check these points.

  • The competency the plan names appears on this page, in this elective's list. A plan identifies "the learning competencies to be targeted during the learning session" (DO 016, s. 2026, para. 7(a)(i)).
  • This file names no term. Ask when the school schedules this elective, and count the weeks on this page from its start.
  • Compare the plan's week with the weeks this page gives its competency. A plan ahead or behind is a question to ask about pacing, not a fault: DO 009, s. 2026 intends the budget of work as "a guiding reference only for teachers in lesson planning" (para. 25).
  • Before the elective ends, compare the competencies the plans have taught with the list here; one not yet taught is something to plan with the teacher. Reports to parents reflect "the competencies covered" (DO 009, s. 2026, para. 28).
  • Where the plan quotes content or performance standards, check that they are the last ones printed before its weeks on this page: this file prints a pair over each unit of weeks. Annex B of DO 016, s. 2026 asks for the content or performance standards "applicable to the sessions", but the order's framework names the competencies, not the standards, so leaving them out is no fault (paras. 7 and 10).

Guides

More Grade 12 budgets of work in Industrial Technologies

Grade 11's file for this elective: Photovoltaic Systems Installation.

About this page

A teacher's lesson plan names its competencies from the curriculum, and this budget of work is a guide to the weeks each one takes. The budget of work's text on this page is DepEd's, as DepEd prints it in its PDF, which DepEd last updated on Jun 19, 2026; this copy was made from that PDF on Nov 16, 2026 by a program and checked against it. The lines under the title, At a glance, For school heads, the links under "More Grade 12 budgets of work in Industrial Technologies", this section, and labels such as "Week" and "Content standard" are NASH Reviewer's.

NASH Reviewer is not affiliated with DepEd, and these pages are free. For the official text, open DepEd's PDF.

If a line here differs from DepEd's PDF, write to support@nash.com.ph.

From the budget of work to the NASH

Practice applying the standards

Checking lesson plans against the curriculum is instructional leadership, part of Focusing on Teaching and Learning, one of the five PPSSH domains the NASH tests. Practice it with timed situational items.

What you practice with

  • Timed situational items, two minutes each
  • Items aligned with the five PPSSH domains and the SOLO taxonomy
  • Partial credit and an explanation for every choice
  • Premium: every practice set and a NASH-style mock exam
Free
Practice sets to start
30-day pass
₱1,000 for 30 days
Lifetime
₱3,000 once

Practice scores are study aids, not official NASH ratings.